Skip to content
Back to home

Forge · KCT Tech Park

A semester without exams

I’m spending my fifth semester as an Innovation Engineer in ProtoSem — a 20-week full-semester immersion run by Forge at KCT Tech Park. Instead of attending lectures and sitting examinations, I’m working full-time in an industry environment on innovation, product engineering and rapid prototyping.

ProtoSem exists to close the gap between engineering education and industry. Companies, startups and organisations bring real problems to Forge; those get broken down into projects or product modules and handed to student teams. Under industry mentors we research, design, prototype, test and iterate, following actual product development practice.

Role
Innovation Engineer
Host
Forge
Venue
KCT Tech Park
Length
20 weeks

Focus areas

  • Embedded systems & microcontrollers
  • IoT sensors & edge computing
  • Industrial automation & robotics
  • Artificial intelligence & machine learning
  • 3D printing & rapid prototyping
  • Electronics design & assembly
  • Product design & development
  • Design thinking & startup fundamentals

Week by week

Week 00 is orientation, then twenty programme weeks. Updated as the semester runs — weeks still to come are listed so the shape of the programme is visible from the start.

13/21

Logged

  1. 00

    Orientation & self discovery

    Logged

    20–24 July 2026

    Week 0 was the beginning of my ProtoSem journey. The sessions focused on introducing the programme, helping us understand ourselves better, and preparing us for the next 20 weeks through interactive activities and professional development.

    1. Day 1

      Mind challenge session

      We took part in mind-challenging games and activities that tested logical thinking, creativity, communication and teamwork. The session was engaging and created real excitement for the learning journey ahead.

    2. Day 2

      ProtoSem orientation

      The mentors introduced the ProtoSem programme, explained its objectives and outlined the activities planned across the next 20 weeks. It gave me a clear picture of what to expect and how the programme develops both technical and professional skills.

    3. Day 3

      16Personalities assessment

      We completed the 16Personalities (MBTI) assessment to understand our traits, strengths and working style. It sharpened my self-awareness — how I respond to different situations and how I collaborate with others.

    4. Day 4

      Character reflection

      We each picked an anime character that best represented our personality. A creative exercise, but it pushed real self-reflection about the qualities and values I relate to most.

    5. Day 5

      LinkedIn branding

      We learned how to build a professional LinkedIn profile — headline, summary and overall presentation — and why networking and a consistent professional presence matter.

    Week 0 helped me understand the purpose of ProtoSem while improving my self-awareness and professional mindset. The activities pushed me to think concretely about my strengths, my personality and where I want my career to go.

    Key learnings

    • Improved logical thinking and teamwork.
    • Understood the objectives of the ProtoSem programme.
    • Learned about my personality and working style.
    • Developed a professional LinkedIn profile.
    • Built confidence for the learning journey ahead.
  2. 01

    Workplace ethics & personal portfolio

    Logged

    27–31 July 2026

    Week 1 focused on workplace discipline, organisation and professional development. We learned why an efficient workspace matters and began building our personal portfolios.

    1. Days 1–3

      5S workplace management

      We learned and implemented the 5S methodology — Sort (remove what isn’t needed), Set in Order (organise what is), Shine (keep it clean), Standardise (follow consistent procedures) and Sustain (keep the habit). We applied it as a team to our own workspace, which made it measurably cleaner and easier to work in.

    2. Day 4

      Personal portfolio development

      We started building a personal portfolio to present skills, projects, achievements, certifications and the learning journey properly. It’s the site you’re reading — and it keeps growing as I finish more work.

    Week 1 taught me that workplace discipline and organisation are not overhead — they are what make sustained work possible. Building the portfolio also made the case for documenting work as you go rather than reconstructing it later.

    Key learnings

    • Learned the practical implementation of the 5S methodology.
    • Understood workplace ethics and professional responsibility.
    • Improved teamwork through collaborative activities.
    • Created a personal portfolio to showcase my skills and achievements.
    • Recognised the importance of continuously updating my professional profile.
  3. 02

    Innovation, programming & app development

    Logged

    3–7 August 2026

    Week 2 focused on improving our knowledge of innovation, programming and mobile application development — moving from logical problem-solving on paper through to a working Android app in four days.

    1. Day 1

      Expert session — Prof. Mukesh Sud

      We attended an expert session by Prof. Mukesh Sud, an author who has written and published several books, including Lean Spark: Frugal by Design, Global in Impact. He shared insights on frugal innovation, entrepreneurship and product development.

    2. Day 2

      Algorithms, flowcharts & Python

      Our mentor introduced algorithms, flowcharts and the basics of Python programming, which grounded how to break a problem down logically before writing any code.

    3. Day 3

      Scratch

      We explored Scratch, a block-based programming platform used to build interactive projects — animations, games and memes. Working visually made the control flow behind a program much easier to see.

    4. Day 4

      MIT App Inventor

      We learned to use MIT App Inventor for Android development. We identified a real-world problem and began designing and building an Android application (APK) to address it.

    5. Day 5

      Applied design thinking

      The Vice President of Forge ran a session on Applied Design Thinking — practical approaches to solving real-world problems through innovation. We closed the week by updating our internship portfolios with everything covered.

    The week connected two ends of the same process: a session on how innovation and products actually get built, then four days spent building. Going from flowcharts to Scratch to a real APK in the same week made the point that the tool changes but the reasoning doesn’t.

    Key learnings

    • Gained insights into innovation, entrepreneurship and product development.
    • Learned algorithms and flowcharts as a way of structuring a problem before coding.
    • Picked up the fundamentals of Python programming.
    • Used Scratch to build interactive block-based projects.
    • Designed and developed an Android application with MIT App Inventor.
    • Applied design thinking to a real-world problem.
  4. 03

    Computational hardware, Fusion 360 & a clay model

    Logged

    10–14 August 2026

    The week split between electronics and CAD. On 10 August we took the Impact Assessment Survey, a 15-minute baseline of how we think technically, solve problems and work in a team. We take it again on Demo Day, and the gap between the two is our “transformation number”. The first Computational Hardware sessions covered power, current and transformers, then capacitance, motor types, semiconductor processes and diodes. Midweek the Industrial Design & Rapid Prototyping (IDRP) module began with Sabareesh G: sketches, constraints and parametric features in Fusion 360, alongside clay modelling. I sculpted a small clay train engine (red body, purple cab roof, blue wheels), photographed it on a grid sheet and rebuilt it in Fusion 360, and on Friday we modelled a part from a reference image. On 13 August our SPoC, Gowrishankar S, opened a team space and asked us to address each other by name, as we would at work.

    Topics learned

    • Electronics fundamentals: power, current, transformers, capacitance, motors and diodes
    • Fusion 360 basics: sketch constraints, Extrude, Revolve, Shell, Hole
    • Canvas: bringing in a photo and calibrating it to real dimensions
    • Matching the CAD model’s mass to the clay model with material density
    • The Impact Assessment Survey and what it measures

    I came in thinking of myself as a software person, so CAD was new. The clay model showed me that the hard part of modelling isn’t the tools but the decisions: which bumps in the clay were intentional and which were my hands being uneven. The folder on my drive is still called “Clay Model Retry”, which says enough about the first attempt.

    Key learnings

    • A fully constrained sketch can be changed later without breaking the model.
    • Turning an imperfect physical object into a precise digital one is about deciding what to copy and what to correct.
    • Small professional habits, like using names, are part of the training too.
  5. 04

    CAD, laser cutting & 3D printing

    Logged

    17–21 August 2026

    IDRP moved from the screen to the workshop. On Monday we modelled a water bottle in Fusion 360 using hybrid modelling. Tuesday was laser fabrication: the difference between cutting, scanning and engraving, followed by a hands-on assessment. Sabareesh G also shared tutorials on 3D printing and on animating and rendering in Fusion 360, and each of us logged our chosen animation tutorial in the student tracker so no two people picked the same one. On Wednesday we were walked through Forge’s ventures and the Forge Innovation Handbook. On 20 August I logged my first laser-cutting job in the Rapid Prototyping sheet, a “Homelab” design on 2 mm clear acrylic, 50 × 50 mm, prepared in RDWorks, and the same day we saw a live 3D printing demo in Bambu Studio. On Friday the marketplace session formed the teams we will build our final prototypes with.

    Topics learned

    • Hybrid modelling in Fusion 360 (a water bottle)
    • Laser cutting versus scanning versus engraving, and preparing cut and scan layers
    • Designing for a fixed size and the laser’s kerf
    • 3D printing from CAD model to STL to Bambu Studio
    • Fusion 360 Animation and Render workspaces

    Until this week everything I made lived on a screen. Seeing a design turn into a piece of acrylic changed how carefully I prepared files: a stray line on screen costs nothing, but on the laser it becomes a ruined cut.

    Key learnings

    • The machine only sees the file, so file preparation is most of the work.
    • Picking cut versus engrave is a design decision, not a setting.
    • Logging every job in a shared sheet keeps a busy lab fair and traceable.
  6. 05

    UI/UX, customer discovery & the MUP kickoff

    Logged

    24–28 August 2026

    The week opened with UI/UX: designing a website to precise user requirements, with Figma and FigJam for wireframes, prototype flows and ideation boards. On Tuesday we built feedback forms to test our project concepts with users. The MUP project began properly when Muheshkumar R shared the MUP tracker and our requirements document on 26 August. On 27 August we had our first meeting with the customer, recorded with Forge’s Minutes of Meeting template. Our team (Team 8, with industry partner Hive Crest Tech) is building multilingual customer interaction intelligence for automotive service centres: an AI that listens to service calls in Tamil, Telugu, Kannada, Malayalam and English and helps the call executive while the call is still running. On Friday we completed the challenge brief and attended a project management session on XMind and ProjectLibre. That weekend we filled in feedback for the modules finished so far: IDRP UI/UX, portfolio development and CAD; Computational Robotics (Think Like a Coder, Scratch and Python basics, MIT App Inventor); and Computational Hardware M1.

    Topics learned

    • UI/UX in Figma and FigJam: wireframes, prototype flows and ideation boards
    • User research with feedback forms
    • Turning a requirements document into a challenge brief: beneficiaries, significance, gaps in current solutions, adoption barriers, target buyers
    • Writing minutes of meeting
    • Mind maps (XMind) and project schedules (ProjectLibre)

    This was the first time I worked on a problem that came from a real company. Reading how service advisors actually lose complaints on calls made the project feel concrete, and it is the part of ProtoSem I was most looking forward to.

    Key learnings

    • Understanding who suffers from a problem, and why current tools fail them, comes before any design.
    • Minutes turn a meeting into decisions and owners.
    • A schedule is a tool for spotting clashes early, not a promise.
  7. 06

    Statement of Work, wireframes & soldering

    Logged

    31 August – 4 September 2026

    Our Statement of Work with Hive Crest Tech was revised on 1 September. It fixed the schedule from concept proposal (14 Sep) and proof of concept (12 Oct) through MUP field trial (16 Nov) to closure (27 Nov), and listed eight critical features, from live transcription in under 2 seconds to post-call CRM records and management analytics. Our lead, Karthik Aravind M, then split the system into five modules with one owner each. Mine is multilingual and conversation intelligence: language detection (including Tamil–English mixed sentences), complaint classification into the partner’s ten categories, and sentiment. We agreed a common call_id, shared JSON formats for every hand-off and /api/v1/ endpoints, so each of us could build against mock data in parallel on our own feature branch. In the UI/UX session we turned the project into a mind map, sitemap and wireframes. Computational Hardware went back to power, voltage and current, and then we soldered a 555 timer LED circuit. In IDRP we were reminded to start 3D printing early, because a print can take 3–4 iterations.

    Topics learned

    • Reading and committing to a Statement of Work: milestones, critical features, constraints
    • API contracts and shared data formats between team members
    • Building against mock data so modules don’t block each other
    • Mind maps, sitemaps and wireframes for our project
    • Soldering and desoldering: a 555 timer LED circuit

    This was the week the project turned into engineering. Having a contract for what my module receives and returns meant I could start building straight away without waiting for anyone, and it made me think about my part as something other people depend on.

    Key learnings

    • Agreeing on data formats first saves weeks of integration pain later.
    • Owning a module means owning its inputs, outputs, tests and known limitations, not just its code.
  8. 07

    IoT, FreeRTOS & the first commits

    Logged

    7–12 September 2026

    A packed hardware week. On Tuesday the ESP32 session covered an I2C OLED display and a reaction game with an ultrasonic sensor. Wednesday was product design: concept generation and concept assessment for our project. On Thursday and Friday we worked through the five IoT tasks, from a web server on the ESP32 to a Firebase web app. We built the full system: an ESP32 with a DHT11 temperature sensor, an LDR and a relay-switched bulb; a Firebase web dashboard with email login, live sensor readings, bulb control and logs (deployed to bulb-v2.web.app on 11 September); an Adafruit IO dashboard over MQTT; and two IFTTT applets that switch the bulb with “Okay Google, activate Bulb On/Off”. On Saturday 12 September the RTOS session ended in an assignment due the same afternoon: a FreeRTOS temperature alert on the ESP32. The same week I made the first commits to our team’s telecalling AI assistant on my feature/conversation-ai branch, and the cohort got the call for Smart India Hackathon 2026.

    Topics learned

    • I2C OLED displays and an ultrasonic sensor on the ESP32
    • Concept generation and concept assessment
    • MQTT publish/subscribe with Adafruit IO
    • Firebase Realtime Database, Authentication and Hosting
    • Voice control through IFTTT and Google Assistant
    • FreeRTOS on the ESP32: tasks, priorities, queues and task notifications

    This was the most hands-on week so far. Getting a physical bulb to switch from a website, a dashboard and my voice made the whole IoT stack click for me, and FreeRTOS showed me a much cleaner way to structure firmware than piling everything into loop().

    Key learnings

    • An IoT system is three systems (device, cloud and app) and each one can fail on its own.
    • An RTOS replaces one big loop with small tasks that each do one job and talk through queues.
  9. 08

    ROS 2 & measuring my module

    Logged

    14–18 September 2026

    Our concept proposal milestone fell on 14 September, and the first two days of the week went to project work. Computational Robotics then moved to ROS 2: we installed Ubuntu and ROS 2 Humble in VirtualBox (or dual boot or WSL) for the session on 16 September, then set up RViz2 and Gazebo Classic and simulated a robot we had modelled in Fusion 360, exported to URDF. On the project side, I ran the first accuracy evaluation of my conversation-intelligence module on 17 September: 8 test calls with 82 turns, scored for complaint detection, coverage and sentiment. Complaint recall was 1.000, precision 0.833 and F1 0.909, and sentiment was within one step on all 8 calls. I also benchmarked speech-to-text: Gemini transcribed a 25.6-second English clip in 2.6 seconds and separated the speakers. The Vishwakarma Awards call came out on 18 September.

    Topics learned

    • ROS 2 basics: nodes, topics, RViz2, Gazebo
    • Describing a robot with URDF, exported from Fusion 360
    • Evaluating a classifier with a fixed test set: precision, recall and F1
    • Comparing speech-to-text options on speed and speaker separation

    Measuring my own module was humbling and useful. The numbers looked good, but writing them down also made the gaps obvious: the Telugu, Kannada and Malayalam test cases still needed review by native speakers, and none of it had run on a real phone call yet.

    Key learnings

    • “It seems to work” isn’t a result. A fixed test set gives a number you can improve.
    • High recall with lower precision means the module catches every complaint but sometimes flags extra ones, which is the safer mistake for this use case.
    • Setting up the environment (Ubuntu, ROS 2) is often the hardest part of a new tool.
  10. 09

    SIH reviews & the build document

    Logged

    21–26 September 2026

    There were no regular sessions this week: Monday went to the Smart India Hackathon internal review, and the rest of the week was project work. Our feedback forms on 22 September covered ROS 2, Embedded Systems (CH M2), Communication Protocols (CH M3) and IoT (CH M4), which closed out the core hardware modules. On 23 September we filled in the Agentic AI readiness form, a baseline before our ASADI specialization course, and assembled at NMIT hall. The same day Muheshkumar R shared the BoM template for our projects and the IoT portfolio guide, a checklist for writing up the IoT assignment. On 24 September I finished a 43-page build document for my branch of the telecalling assistant: the console’s surfaces, 335 backend tests and 21 console tests, the accuracy results and an honest list of what was still not built. From 25 September every 3D print and laser cut, including repeats, had to be logged and approved in the Rapid Prototyping sheet.

    Topics learned

    • Writing technical documentation for teammates who will integrate my work
    • Bills of materials for a software-heavy project
    • Logging and approval for every 3D print and laser cut

    Writing the build document forced me to look at my own work the way a reviewer would. It was the first time I wrote down limitations as clearly as features, and it made the conversation with the team about next steps much easier.

    Key learnings

    • Documentation is part of the deliverable: a module nobody can run is a module nobody can use.
    • Listing what is not done is as important as listing what is.
  11. 10

    Agentic AI & PoC costs

    Logged

    28 September – 1 October 2026

    The week’s sessions were on Agentic AI: the fundamentals on Monday, two days of building with it (first a website, then a larger SaaS product), and a recap on Thursday. Our PoC bill of materials was due on 28 September. Because the proof of concept runs on lab machines, a local PostgreSQL database and the free tiers of the telephony, speech-to-text and LLM providers, its cost came to ₹0; the real costs start at the MUP stage. 30 September was the original deadline for all IDRP assignments. It was later extended (the first three by 10 October, the rest by 15 October, with a mark deduction), which showed how many of us had let them slide while project work picked up. On 4 October we were told the next day’s pitch session was mandatory.

    Topics learned

    • Agentic AI fundamentals, and building a website and a SaaS product with AI agents
    • Costing a proof of concept on free tiers, and what changes when it has to run for real users
    • Prioritising coursework deadlines against project milestones

    This week I felt the pull between the MUP project and the module assignments. The project is more exciting, but the assignments are where the marks are recorded.

    Key learnings

    • A ₹0 PoC is a deliberate choice: prove the idea before spending money on it.
    • Deadlines from different modules collide; a single list of everything due is worth keeping.
  12. 11

    Pitching, Edge AI & Prof. Ashwin Mahalingam

    Logged

    5–9 October 2026

    On 5 October we had a full-day session on pitch presentations: how to communicate an idea, its value proposition and its innovation to evaluators and industry people, and why a strong pitch affects how a project is judged. Each team then uploaded its pitch deck. On Tuesday 6 October I attended the Edge AI session of our ASADI specialization. On 7 October the cohort met Prof. Dr. Ashwin Mahalingam at SKT Hall for an interactive session. On the project, my work this week was the multilingual conversation intelligence and language identification for the proof of concept. The IoT submission sheet locked on 8 October, and the first three IDRP assignments closed on 10 October.

    Topics learned

    • Communicating an idea’s value proposition and innovation in a pitch
    • Edge AI: running models on the device instead of in the cloud
    • Language identification for mixed-language speech

    Pitching made me explain our project without any of the technical detail I usually hide behind. Saying “every complaint heard, while there is still time to ask” in one line was harder than building the feature.

    Key learnings

    • A pitch is judged in the first minute; lead with the problem, not the technology.
    • Work isn’t submitted until the link is in the tracker.
  13. 12

    Testing the PoC on real phone lines

    In progress

    12–16 October 2026

    The proof of concept milestone was 12 October, and our team’s focus this week is testing. On Monday I worked on API keys and access to Plivo, the telephony provider, so the system can take its first real phone calls instead of recorded ones. On Tuesday I worked on the bill of materials with Karthik and Praveen. The same day the Computational Hardware checklist came out: four assignments due 16 October (Arduino LED interfacing, soldering, a sensor and actuator presentation, and an OLED game). The FreeRTOS write-up and quiz, the last three IDRP assignments and LinkedIn post approval were due 15 October. I also finished my IDRP laser-cutting report and published my IoT portfolio. Next is the PoC field trial on 19 October.

    Topics learned

    • Connecting to a real telephony provider: numbers, call audio streaming, costs
    • Moving from a PoC BoM to an MUP BoM: what scales with call volume

    Key learnings

    • A system that works on recordings still has to prove itself on a live phone line.
  14. 13

    Startup fundamentals, finance & the startup meeting

    Logged

    19–23 October 2026

    Monday and Tuesday were holidays, so the working week ran from Wednesday. On Wednesday our team prepared for the meeting with Hive Crest Tech, our industry partner. Thursday’s session had two parts. The first was on how a startup is built: the startup J-curve (create, release, morph, model, scale, harvest), the difference between innovation and invention, the startup ecosystem, and the Business Model Canvas. The second part was on finance and money decisions, taught through everyday examples rather than formulas. On Friday 23 October the team met the startup.

    1. Days 1–2

      Holidays

      No sessions or project work were scheduled on Monday and Tuesday.

    2. Day 3

      Preparing for the startup meeting

      The whole team got ready for the meeting with Hive Crest Tech. Everyone on the team prepared their own part.

    3. Day 4

      Startup fundamentals and finance

      The first half covered the startup J-curve, innovation versus invention, the startup ecosystem and the Business Model Canvas. The second half was a finance session built around real-life examples.

    4. Day 5

      Meeting with the startup

      Our team, led by Karthik, met the Hive Crest Tech team.

    Topics learned

    • The startup J-curve: create, release, morph, model, scale, harvest
    • Innovation (starts from what customers need) versus invention (starts from what we know)
    • The startup ecosystem: founders, investors, mentors, incubators, universities, government and corporates
    • The Business Model Canvas and its nine blocks
    • Everyday finance decisions

    The startup session gave me words for something I’d noticed already: a young company often looks worse before it looks better, and its customers define what is worth building. Sitting in the meeting with Hive Crest Tech straight after made that concrete, because they are exactly that kind of company.

    Key learnings

    • A startup’s early dip is normal; the work is getting through it.
    • Start from the customer’s need, not from the technology you already have.
    • The Business Model Canvas puts a whole business on one page, which makes gaps easy to spot.
    • Preparing before a partner meeting is what makes the meeting useful.
  15. 14

    Software final, ROS 2 and the Edge AI brief

    In progress

    26–30 October 2026

    This was the week the portfolio became the software development final: an assistant on every page that answers from a SQL-backed FAQ, an error-code reference, support tickets, chat logs and feedback in MongoDB, request logging, a health page and a GitHub API call with a timeout and fallback. It is live at tringytrongy.tech. The same week I ran ROS 2 assignments 1 and 2. In Turtlesim a node I wrote draws my name, VISWES, and rqt_graph shows it publishing to the turtle. For assignment 2 I modelled a two-wheel robot in Fusion 360, exported the parts, wrote the URDF and checked it in RViz, the TF tree and Gazebo. Both were submitted through the IET Tracker on 28 October. The Edge AI & Embedded Vision individual assessment was also set: five milestones, detect, optimise, decide and act, monitor and connect, and a complete system with a dashboard, due 10 November.

    Topics learned

    • A site assistant that answers from a FAQ table, explains error codes and raises tickets
    • Structured request logging, a health endpoint and a third-party API with a timeout and fallback
    • ROS 2 nodes, topics and Twist commands; URDF links, joints and inertia from a CAD model
    • TF frames, RViz, Gazebo and the differential-drive plugin
    • Edge AI assessment: detect, optimise, decide and act, monitor, dashboard

    Key learnings

    • Every failure path needs a named error code and a fallback, or the page that breaks is the one you demo.
    • In Gazebo Classic a robot can simulate correctly and still be invisible: the package:// mesh paths have to be on GAZEBO_MODEL_PATH.
    • Open-loop driving in Gazebo covered 94 to 98% of the commanded distance, and the gap tracked the simulator’s real-time factor rather than the robot.
    • Inertia computed from the CAD meshes matched my hand estimates, which was a useful check on both.
  16. 15

    Coming soon

    Pending
  17. 16

    Coming soon

    Pending
  18. 17

    Coming soon

    Pending
  19. 18

    Coming soon

    Pending
  20. 19

    Coming soon

    Pending
  21. 20

    Coming soon

    Pending